Carrier operating and maintanance Specifiche Pagina 62

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 116
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 61
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 52
1. Turn on the safety and work
lights. (Switches are located on
the switch panel in the dash.)
2. Position the rear of the carrier
about 4 feet from the vehicle you
intend to load. Make sure you
are in line with the vehicle.
3. Place the carrier’s transmission
gear selector into Neutral or Park
and set the parking brakes.
4. Engage the power take-off
(PTO). Refer to PTO operator’s
manual. NEVER TRAVEL WITH
THE POWER TAKE-OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
OUT
OUT
POWER
WER
TAKE-OFF
AKE-OFF
4 FT
P
R
N
4
2
1
D
BE
ACON
LIGH
T
AU
X
WAR
N
REAR
FLO
OD
WORK
LIGHT
MASTE
R
0
N
0N
0
N
0
N
0N
Vedere la pagina 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 115 116

Commenti su questo manuale

Nessun commento