Carrier 58PHA/PHX Installation, start-up, operating and Specifiche

Navigare online o scaricare Specifiche per Riscaldatori e bollitori per acqua Carrier 58PHA/PHX Installation, start-up, operating and. Carrier 58PHA/PHX Installation, start-up, operating and Specifications [en] Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 29
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
P056623B
Rev. 2 09/08
HANDBOOK
INSTALLATION & OPERATION
onna-3'
CASES
NARROW MULTI-DECK
General Information ........................................................... 2
Using Outriggers ................................................................ 3
Case Dimensions................................................................ 4
Case Operation ................................................................... 5
Installation ........................................................................... 6
Plumbing ............................................................................. 7
Refrigeration Components ................................................ 8
Refrigeration Piping ........................................................... 9
Electrical Hook-Up....................................................... 10-11
Defrost & Temperature Control ....................................... 12
Air Flow & Product Loading ............................................ 13
Parts Ordering .............................................................14-15
Appendix A: Wiring Diagrams
Appendix B: Control Settings
Appendix C: Use & Maintenance
Table of Contents
Vedere la pagina 0
1 2 3 4 5 6 ... 28 29

Sommario

Pagina 1 - HANDBOOK

P056623BRev. 2 09/08HANDBOOKINSTALLATION & OPERATIONonna-3'CASESNARROW MULTI-DECKGeneral Information ...

Pagina 2

9TXVBulbEvaporatorFansCondenserFansServiceValveTXV1/4”AccessValveEvaporatorCondenserCompressorReceiverServiceValveFilterDrierTankAreaFlow DirectionDua

Pagina 3 - GENERAL INFORMATION

10CONDENSATE PUMP (connected to junc-tion box receptacle)ELECTRICAL HOOK-UPNo in-field wiring is required for installation of the ONNA - 3': all

Pagina 4 - USING OUTRIGGERS

11HOW TO ACCESS BALLASTSAn electronic ballast operates the case lamp and is located in the electrical junction box behind the front panel.To gain acce

Pagina 5 - CASE DIMENSIONS

12DEFROST & TEMP CONTROLTEMPERATURE CONTROL PROBE LOCATION(behind the 3” plug button).The ONNA uses timed-off defrost as its primary defrost metho

Pagina 6 - CASE OPERATION

13DISCHARGE...1LOAD LIMIT...2 AIR FLOW...3RETURN AIR GRILL...4MODEL ONNAAIR FLOW & PRODUCT LOADINGCase

Pagina 7 - INSTALLATION

14PARTS ORDERING921222325161110371222436131781353418192015547382928336403132293273014392622171750E06E07E10E11E09MODELONNA

Pagina 8 - PLUMBING

15 Location Number Part Descriptions 1 Pump Bracket 2 March Pump Model 3 Upper Back Panel 4 Rear Pipe & Wiring Covers 5 Lower R

Pagina 9 - REFRIGERATION COMPONENTS

APPENDIX A:WIRING DIAGRAMS

Pagina 11 - ELECTRICAL HOOK-UP

APPENDIX B:CONTROL SETTINGS

Pagina 12 - HOW TO ACCESS BALLASTS

DANGERRemove hands and feet from beneath the case before the casters are removed. Failure to do so may result in serious injury when the case is lowe

Pagina 13 - DEFROST & TEMP CONTROL

XR03CX-HF.doc XR03CX& 1/2 D IGITAL CONTROLLER XR03CX 1. CONTENTS 1. Contents _____________________________________

Pagina 14 - IR FLOW & PRODUCT LOADING

XR03CX-HF.doc XR03CX& 2/2 dP Defrost start after Power failure: (n - y) n= the defrost clock will reset; y= start

Pagina 15 - PARTS ORDERING

APPENDIX C:USE & MAINTENANCE

Pagina 16 - (Part Ordering, cont'd)

DANGERElectrical Shock Hazard Always disconnect power to case when servicing or cleaning. HIGHPRESSUREWARNINGSwitch Off Both Power Switches Before P

Pagina 17 - APPENDIX A:

WARNINGVerify Both Power Switches Are Off Before Cleaning Case.HIGHPRESSUREVerify that both switches were turned are OFF dur-1. ing pre-cleaning. Both

Pagina 18

CAUTIONThe heating element in the evaporator pan is very hot when on.HIGHPRESSUREIn store service is limited and can be completed in just a few minute

Pagina 21

09/08WARRANTYHEREINAFTER REFERRED TO AS MANUFACTURERFOURTEEN MONTH WARRANTY. MANUFACTURER’S PRODUCT IS WARRANTED TO BE FREE FROM DEFECTS IN MATERIAL

Pagina 22 - USE & MAINTENANCE

1925 Ruffin Mill Road, Colonial Heights, VA 23834Due to our commitment to continuous improvement all specifications are subject to change without noti

Pagina 23 - IN- STORE SERVICE FOR ONNA-3

2Description of CasesSpecifically covered in this manual is the Model ONNA-3' narrow multi-deck merchandiser. Store ConditionsHill PHOENIX cases

Pagina 24 - P071253M SERVICE REV 0

3USING OUTRIGGERSHill Phoenix cases are manufactured and shipped to stores with outriggers installed on the base frame. This ensures that moving the

Pagina 25

428 11/16 in[728.3 cm]85 9/16 in[2174.1 cm]51 5/8 in[1311.6 cm]17 5/16 in[439.4 cm]16 7/8 in[428.1 cm]12 5/16 in[312.4 cm]25 1/2 in[647.3 cm]26 1/2 in

Pagina 26

5All measurements are taken per CRMA specifications.Electrical DataModelFans per CaseStandard FansCondenserFansDrain PumpEvaporator Pan HeaterDrain He

Pagina 27

6INSTALLATIONBASE FRAMEFRONT PANELKICKPLATEThe ONNA-3' is shipped with most of the exterior panels and trim already installed. The only exterior

Pagina 28 - WARRANTY

7PLUMBINGAll of the plumbing components are attached to the case at the factory; therefore, no assembly is required. The case drain is located front-

Pagina 29 - Maintenance & Case Care

8REFRIGERATION COMPONENTSAccess Valve - Access port on the evaporator that allows service personnel to check system pressure.Accumulator - A device in

Commenti su questo manuale

Nessun commento